Select Page

JD Fields

Designer

  • Skateboarder since 1999, Mountain biker since 2010
  • Skatepark designer since 2008
  • Travelled all over the U.S. doing skateboard shows and contests
  • Placed 1st (Expert) at the Autumn Ramp Park Summer Contest Series
  • Areas of expertise include: Skatepark Design, Mountain Bike Park Design, Public Meetings, 3DS Max, SketchUp, 3D Modeling, Auto-Cad

Brandon Yarborough

Builder

  • Skateboarder since 2006
  • Pro Skateboarder for Demonseed Skateboards
  • Skatepark/ramp builder and shotcrete parks since 2014
  • Notable Projects: Charleston, SC; Tampa, FL – Bro Bowl; Woodward East; Orlando Park; Jax Beach Park
  • Areas of expertise include: Staking, Layout, Sub-Surface Drainage Installation, Rough Grading, Fine Grading, Metal Installation and Forming, Rebar Installation on Transitions, Ledge Work, Shotcrete Placement, Shotcrete Finish, Rebar Installation on Decks, Concrete Decks, Finish, Acid Staining, Form Work, Forklift, Excavator, Compactor, Welder, Skill-Saw

Chris “Boon” Volkwine

Site Supervisor

  • BMXer since 2001
  • Downhill MTB since 2016
  • Custom and shotcrete skatepark and pumptrack builder since 2016
  • Notable projects: Kanab, UT Skatepark/Asphalt Pumptrack; OKC Boathouse; Philly pumptrack; Ningbo, China International School Pumptrack and Skatepark; Salt Lake City, UT – 9line Bike Park
  • Staking, Layout, Sub-Surface Drainage Installation, Rough Grading, Fine Grading, Metal Installation and Forming, Rebar Installation on Transitions, Ledge Work, Shotcrete Placement, Shotcrete Finish, Rebar Installation on Decks, Concrete Decks, Finish, Acid Staining, Form Work, Forklift, Excavator, Compactor, Welder, Skill-Saw, Shotcrete Pump

Ben Horan

Site Supervisor

 

  • Skateboarder since 1995, wakeskater since 2002
  • Custom and shotcrete skatepark and wakeskate park builder since 2005
  • Notable projects: Miami, FL (Lot 11); Abu Dhabi, UAE; Fort Smith, AR, Norman, OK, The Block Skate Supply Plaza; Ningb, China International School Pumptrack and Skatepark; The Hotel Nahunta Skatepark; Valdosta Wake Compound Wakeskate and Skatepark; multiple pro wakeskate tour builds
  • Areas of expertise include: Layout, Rough Grading, Fine Grading, Metal Fab, Welding, Forming, Rebar, Transitions, Flat Work, Ledges, Concrete Finisher, Shotcrete Placement, Shotcrete Finish, Line Pumping, Concrete Flat Work, Ledges, Wood Skateparks, Skatepark Design, SketchUp software

Heather Ogden

Senior Project Manager

  • Project Management since 1998
  • San Jose State University – Construction Estimating and Construction Project Management
  • LEED Green Associate
  • OSHA 10-Hour Certification
  • Notable Projects: Miami, FL (Lot 11 Skatepark); Fort Atkinson Wheels Park, Fort Atkinson, WI; Ka’a’awa, HI Private Skatepark; Festival Fields Skatepark and Pump Track, Avondale, AZ; Fort Smith Skate Park and Pump Track, Fort Smith, AR; Smith Playground Skatepark and Pump Track; Boston, MA; Moana Pacific High Rises, Honolulu, HI; Atria Tamalpais Remodel and LEED Certification, Novato, CA; Atria Valley View Remodel and LEED Certification, Walnut Creek, CA; La Paloma Residential Estate, Los Altos, CA