Select Page

Montauk

Welcome to your community input page for Montauk’s skatepark design!

Project Background

The Montauk Skatepark project will transform the current skatepark full of prefabricated skate surface into an updated park that will be enjoyed by users of any experience level for generations to come. This is the first in a two-step survey process. We’ll review initial input, improve our design and then come back for another round to make sure your design is perfected.

What’s Next

Using the information gathered from this public community survey, Pivot Custom will tweak your skatepark design.

Granby

Project Background

The Granby Skatepark project will transform the current 12,000 sf skatepark full of wood and composite skate surface into a fully concrete park that will be enjoyed by users of any experience level for generations to come. This is the first in a two-step survey process. We’ll review initial input, improve our design and then come back for another round to make sure your design is perfected.

What’s Next

Using the information gathered from this public community survey, Pivot Custom will tweak your skatepark design.

Nathan Bemo

President/Owner/Project Manager

  • Skateboarder since 1986, mountain biker since 2009  
  • Built and ran skatepark from 1994-1998  
  • Founded American Ramp Company in 1998  
  • Responsible for 1000s of skateparks in 43 countries  
  • BS Business (and minor in Total Quality Management) from Missouri Southern State University, 1998; Contractor’s license holder in multiple states

Veronica Larsson

Builder

  • Skateboarder since 2016, Wakeskating since 2012
  • Hands on construction of over 15 skateparkss
  • Skatepark/ramp builder and shotcrete parks since 2018
  • Notable Projects/Achievements: Abu Dhabi, UAE; Fort Smith, AR; Miami, FL (Lot 11); BA in Fine Arts
  • Areas of expertise include: Welding, Metal Installation and Forming, Rebar Installation, Shotcrete Finish

Matt Atkin

Builder

  • Skateboarder since 1987, Snowboarder since 1990
  • Hands on construction of over 20 skateparks
  • Skatepark/ramp builder and shotcrete parks since 2015
  • Notable Projects/Achievements: Fort Smith, AR; Miami, FL (Lot 11); Golden, CO skatepark; won 1st place Breckenridge skate contest 2005; BA, New York University 1998
  • Areas of expertise include: Staking, Layout, Sub-Surface Drainage Installation, Rough Grading, Fine Grading, Metal Installation and Forming, Rebar Installation on Transitions, Ledge Work, Shotcrete Placement, Shotcrete Finish, Rebar Installation on Decks, Concrete Decks, Finish, Acid Staining, Form Work, Forklift, Excavator, Compactor, Welder, Custom Wood Skatepark Construction, Pool Coping Production and Installation